Project References
Where the work has landed.
Air traffic management projects delivered within tight timescales to a high level of quality. Airspace changes, cutting-edge ATC system rollouts, and the transition of new operational functions across the region and beyond.
31References on file
05Regions on record
The record
Every reference, by discipline.
Air traffic management projects delivered across airspace and procedures, systems and equipment, operations, and consultancy. Each card opens to the live record on gans.aero.
Discipline
- 01Airspace & ProceduresMiddle East
Major Airspace Restructure
Open the reference - 02Airspace & ProceduresMiddle East
RNP-AR Procedures
Open the reference - 03Airspace & ProceduresUnited Arab Emirates
Unmanned Aerial Systems (UAS) Area
Open the reference - 04Airspace & ProceduresMiddle East
Establishment of General Aviation Area
Open the reference - 05Airspace & ProceduresMiddle East
Establishment of Military Air Traffic Zone
Open the reference - 06Airspace & ProceduresMiddle East
Implementation of 3 NM Separation Standard in CTA
Open the reference - 07Airspace & ProceduresMiddle East
Change in Designation of CTA
Open the reference - 08Airspace & ProceduresMiddle East
Modification of VFR Routes
Open the reference - 09Airspace & ProceduresMiddle East
Implementation of AFIS
Open the reference - 10Airspace & ProceduresMiddle East
Revised Missed Approach
Open the reference - 11Airspace & ProceduresMiddle East
Independent Parallel Departures
Open the reference - 12Systems & EquipmentMiddle East
Electronic Terrain Obstacle Database
Open the reference - 13Systems & EquipmentMiddle East
Electronic Flight Strips & Departure Manager
Open the reference - 14Systems & EquipmentUnited Arab Emirates
360 Tower Simulator Installation & Commissioning
Open the reference - 15Systems & EquipmentMiddle East
Additional Controller Working Positions
Open the reference - 16Systems & EquipmentMiddle East
Implementation of New MSSR
Open the reference - 17Systems & EquipmentMiddle East
Provision of New Voice & Data Recorders
Open the reference - 18Systems & EquipmentMiddle East
Implementation of Arrival Manager (AMAN)
Open the reference - 19Systems & EquipmentMiddle East
Installation of Redundancy RVR Equipment
Open the reference - 20Systems & EquipmentMiddle East
Flight Data Operator & Radar Observer Position
Open the reference - 21Systems & EquipmentMiddle East
Airport Collaborative Decision Making (A-CDM)
Open the reference - 22OperationsMiddle East
Operational Transition
Open the reference - 23OperationsUnited Arab Emirates
Visual Control Room Refurbishment
Open the reference - 24OperationsUnited Arab Emirates
ATC Tower Refurbishment (Three Airports)
Open the reference - 25OperationsMiddle East
CAT II ILS/DME Systems Procurement & Installation
Open the reference - 26OperationsUnited Arab Emirates
Commissioning Air Traffic Control Towers
Open the reference - 27ConsultancySpain
Spain Training Consultancy
Open the reference - 28ConsultancyKazakhstan
Kazakhstan Engineering Consultancy
Open the reference - 29ConsultancyUnited Arab Emirates
Sharjah International Airport Consultancy
Open the reference - 30ConsultancyMiddle East
Engineering Consultancy
Open the reference - 31ConsultancyEgypt
Egypt Airport Consultancy
Open the reference
On the ground
The work travels. The standard does not move.
Every engagement is shaped to the regulator, the operator, and the airspace it sits inside. Outcomes are written in operational use, not in slide decks. Ask about a brief and we will match it to the closest precedent on record.
- Regions on record
- United Arab EmiratesWider Middle EastSpainKazakhstanEgypt

